Haradh GOSP-3 / Operations Dashboard
System Online — Real-Time Monitoring
Thu, Mar 5, 2026 · Ghawar Field — South Haradh
Crude Oil
287,000 BOPD
of 300,000 capacity (95.7%)
Associated Gas
132 MMSCFD
of 140 capacity (94.3%)
Water Injection
3,840 m³/h
of 4,000 capacity (96.0%)
Power Generation
58.4 MW
of 64.0 capacity (91.3%)
3 warning9 healthy
1 emergency WO3 high priority WOFleet availability: 97.3%
Fleet Availability -0.3%
96.8%
Crude Throughput 0%
287KBOPD
Active Alerts +3
10
Predicted Failures +1
430-day
Mean Health Index -1.2%
83.4%
Cost Avoidance YTD +$1.4M
$6.8M
Fleet Health Index
12-month rolling average — all 12 assets
83.4%
Crude Production
BOPD — 12-month trend vs 300K capacity
287K
Fleet Health by Equipment Type
12 monitored assets across 6 categories
3D View
Gas Turbines
3 units
90%
 HRDH3-GT-0001A87%
 HRDH3-GT-0002A91%
 HRDH3-GT-0003A93%
🔄
Compressors
2 units
78%
 HRDH3-K-0001A71%
 HRDH3-K-000384%
HRDH3-K-0001A: Needs attention
Separators
2 units
93%
 HRDH3-V-000194%
 HRDH3-V-000292%
🔥
Heat Exchangers
2 units
73%
 HRDH3-E-010164%
 HRDH3-E-020182%
HRDH3-E-0101: Needs attention
💧
Pumps
2 units
85%
 HRDH3-P-0101A81%
 HRDH3-P-0201A88%
ESP
1 unit
78%
 HRDH3-ESP-W01278%
HRDH3-ESP-W012: Needs attention
Risk Priority Index
Impact × Probability ranking
Analytics
1
HRDH3-K-0001A
MAN RB Barrel Compressor — HP Train A
Weakest: Dry Gas Seal NDE (John Crane 28AT) (62%)
60
$1.6M/day
2
HRDH3-E-0101
Crude/Crude HX (TEMA AES, 1240 tubes)
Weakest: Spiral Wound Gaskets (SS/Graphite) (53%)
58
$0.4M/day
3
HRDH3-P-0101A
Flowserve BB5 Crude Shipper Pump A
Weakest: Mech Seal (John Crane 4600, API 53B) (71%)
41
$1.2M/day
4
HRDH3-ESP-W012
Baker Hughes 400 Series ESP — Well 12
Weakest: Motor Seal Section (72%)
40
$0.7M/day
5
HRDH3-GT-0001A
GE LM2500+G4 DLE Gas Turbine Gen A
Weakest: Journal Bearing #2 (Tilting-Pad) (73%)
38
$1.9M/day
6
HRDH3-V-0001
HP Production Trap (HPPT) — 3-Phase
Weakest: Cyclonic Inlet + Coalescing Plates (88%)
37
$2.8M/day
Live Alert Feed
2 critical · 4 unacknowledged
10
HRDH3-K-0001AJust now
NDE Dry Gas Seal primary leak rate 28.5 Nm³/h — exceeds 20 Nm³/h limit (John Crane 28AT)
Seal Leak Rate: 28.5 Nm³/hthreshold: 20
HRDH3-E-0101Just now
Tube bundle fouling 0.00042 m²·K/W approaching TEMA limit 0.0005
Fouling Factor: 0.00042 m²·K/Wthreshold: 0.0005
HRDH3-GT-0001AJust now
Journal Bearing #2 vibration 4.2 mm/s trending to ISO 10816 Gr1 alarm (4.5)
Vibration: 4.2 mm/s RMSthreshold: 4.5
HRDH3-K-0001A6h ago
1st stage impeller 1× vibration 5.8 mm/s — mass imbalance per API 617
Vibration: 5.8 mm/s RMSthreshold: 4.5
HRDH3-E-010110h ago
Channel gasket degradation — Arrhenius model predicts failure in 20 days
Remaining Life: 420 hoursthreshold: 720
HRDH3-GT-0001A14h ago
Combustion hot spots TT-2504: 1180°C exceeds DLE limit 1150°C per GE SB-2024-015
Temperature: 1180 °Cthreshold: 1150
HRDH3-ESP-W01217h ago
ESP motor winding 165°C approaching 175°C trip — intake GVF rising to 22%
Temperature: 165 °Cthreshold: 175
HRDH3-P-0101A19h ago
Mech seal barrier fluid consumption up 40% in 30d — API Plan 53B John Crane 4600
Seal Leak: 0.14 L/hrthreshold: 0.2
Upcoming Maintenance
8 planned · $3.8M total
Planner
10
Mar
HRDH3-K-0001A
Replace NDE Dry Gas Seal Assembly (John Crane 28AT)
emergency72h · $185,000in 5d
10
Mar
HRDH3-K-0001A
1st Stage Impeller In-Situ Balancing (Ø650mm)
high48h · $95,000in 5d
15
Mar
HRDH3-ESP-W012
ESP Performance Review — Well 12 (Baker Hughes 400)
medium8h · $12,000
18
Mar
HRDH3-E-0101
Tube Bundle Hydroblast + Gasket Replacement
high96h · $165,000
22
Mar
HRDH3-GT-0001A
Journal Bearing #2 Borescope + Ferrographic Oil Analysis
high24h · $42,000
Equipment Fleet Register
HRDH312 assets
TagEquipmentAreaStatusHealthCriticalityOp HoursAvailabilityNext Maint.Impact ($/day)
HRDH3-GT-0001AGE LM2500+G4 DLE Gas Turbine Gen AArea 25 — Power Islandhealthy
87%
A42,85097.2%2026-05-15$1850K
HRDH3-GT-0002ASolar Titan 130 Compressor Drive AArea 12 — Gas Compressionhealthy
91%
A38,10098.1%2026-04-20$1400K
HRDH3-K-0001AMAN RB Barrel Compressor — HP Train AArea 12 — Gas Compressionwarning
71%
A38,20094.8%2026-03-20$1600K
HRDH3-K-0003Ariel JGK/4 Recip Compressor — Gas LiftArea 14 — Gas Lifthealthy
84%
B28,90096.5%2026-06-10$520K
HRDH3-V-0001HP Production Trap (HPPT) — 3-PhaseArea 30 — Separationhealthy
94%
A68,40099.1%2026-12-01$2800K
HRDH3-V-0002LP Production Trap (LPPT) — 2-PhaseArea 30 — Separationhealthy
92%
A68,40099.4%2026-12-01$2200K
HRDH3-E-0101Crude/Crude HX (TEMA AES, 1240 tubes)Area 45 — Heat Exchangewarning
64%
B52,10096.5%2026-04-10$420K
HRDH3-P-0101AFlowserve BB5 Crude Shipper Pump AArea 61 — Pump Alleyhealthy
81%
A29,80098.4%2026-04-05$1200K
HRDH3-P-0201ASulzer HPcp Water Injection Pump AArea 62 — Water Injectionhealthy
88%
A24,60097.8%2026-08-15$980K
HRDH3-ESP-W012Baker Hughes 400 Series ESP — Well 12Wellpad North — Arab-D Reservoirwarning
78%
A19,20093.2%2026-06-15$680K
HRDH3-GT-0003ASiemens SGT-400 WI Turbine Drive AArea 62 — Water Injectionhealthy
93%
A31,20098.6%2027-07-20$980K
HRDH3-E-0201Gas Aftercooler (TEMA BEM, Cu-Ni tubes)Area 12 — Gas Compressionhealthy
82%
B38,20097.8%2026-09-20$280K